Outside at connector hallway, 6-2-08
Viewed: 184 time(s)
|
New West Door entry, 6-2-08
Viewed: 216 time(s)
|
More Lockers, 6-2-08
Viewed: 205 time(s)
|
Suspended Ceiling, 6-2-08
Viewed: 197 time(s)
|
Pre-school Entry, 6-2-08
Viewed: 206 time(s)
|
Pre-school from North, 6-2-08
Viewed: 206 time(s)
|
Connector at Existing "classroom," 6-2-08
Viewed: 208 time(s)
|
Connector, looking to existing, 6-2-08
Viewed: 204 time(s)
|
After rain, 6-9-08
Viewed: 203 time(s)
|
West entry, 6-12-08
Viewed: 211 time(s)
|
Pre-school entry, 6-12-08
Viewed: 189 time(s)
|
Laying Tile, 6-17-08
Viewed: 192 time(s)
|